Open tender · South Africa · Works

E3558GXMPARN

Eskom

Eskom in South Africa is inviting bids for “Dredging of high level and low-level Ash Water Return Dams at Arnot Power Station on “as and when required basis” for period of 36 months (3 years)”. Bids close on 13 October 2026.

The work

Dredging of high level and low-level Ash Water Return Dams at Arnot Power Station on “as and when required basis” for period of 36 months (3 years).

Key facts

Published
16 Sep 2026