Open tender · South Africa · Works
E3558GXMPARN
Eskom
Eskom in South Africa is inviting bids for “Dredging of high level and low-level Ash Water Return Dams at Arnot Power Station on “as and when required basis” for period of 36 months (3 years)”. Bids close on 13 October 2026.
The work
Dredging of high level and low-level Ash Water Return Dams at Arnot Power Station on “as and when required basis” for period of 36 months (3 years).
Key facts
- Published
- 16 Sep 2026